Skip to content
+48 601919405
Sadowa 40 Str. PL05-520 Konstancin-Jeziorna, POLAND
Monday - Friday: 9.00 a.m. - 16.00 p.m.
Homepage
Our company
About us
Achievements
Pictures of our installation
News
Our partners
Pierre Guerin
End Armaturen
Gestra
Goetze
Asco/Numatics
IMI NORGREN – Herion
Clorius
Yokogawa
Spirax Sarco
IMI Buschjost
ARI Armaturen
VYC Industrial
Valsteam ADCA
Buerkert
Offer
Full offer
Detailed offer
Shop
Contact
Polski
English
Homepage
Our company
About us
Achievements
Pictures of our installation
News
Our partners
Pierre Guerin
End Armaturen
Gestra
Goetze
Asco/Numatics
IMI NORGREN – Herion
Clorius
Yokogawa
Spirax Sarco
IMI Buschjost
ARI Armaturen
VYC Industrial
Valsteam ADCA
Buerkert
Offer
Full offer
Detailed offer
Shop
Contact
Polski
English
Pictures of our installation
Strona główna
/
About us
/
Pictures of our installation
Construction of a steam-water substation at the client’s
Steam collector with shut-off valves
Condensate pump unit during setting
We begin assembly of the ZWZ at the coustomer location
Before we start modernizing something …..
Insulated aggregate with condensate pump
The finished pumping unit goes to the customer
Steam reduction station before insulation
ABRAMS KWC-DHW device, aggregate with ADCAMAT pump and steam pressure reduction station in the dairy, during assembly and adjustment
Everything prepared for the isolation process in the dairy
ADCA valve with positioner at PWHU in the dairy
ADCA control valve in a dairy, mounted on a compact central heating node steam – water
ADCA pump installed in a beverage factory
ADCA components in a dairy pressure reduction station
ADCA fittings used for pressure reduction stations and manifolds in a dairy
Dehydration of the steam dryer
ADCA control valve in a compact steam-water substation
Details of the steam-water substation
ABRAMS PWHU device, ADCAMAT pump and dairy pressure reduction station during assembly and adjustment
Collector and reduction station, steam-water substation, during assembly and adjustment
Steam reduction station installed by us on the wall
ABRAMS condensate pump unit working in a dairy plant
Compact heating node in the function of central heating and a reduction station on the wall
Stainless steel ABRAMS condensate pump unit
PWHU – CDW without tank
PWHU-CDM with tank
Installation of the ZWZ and assembly of the degassing unit on it
Continued montage of process installations
Montage of process installations
Double compact steam-water substation on STH Exchangers type used for technology
Discharge of contaminated condensate on a 3-way valve
Discharge of contaminated condensate on a 3-way valve continued
Installation of contaminated condensate discharge devices on a 3-way valve
Another condensate pumping unit
Steam heating sewage installation on an injector
We are building a steam and condensate installation in a dairy
Heat insulated condensate pump unit
PWHU-CDM on a plate heat exchanger, steam from our collector
Steam reducing valve service
Flow regulation
Automation “watches” the exact operation of the steam-water node
To install a steam separating impulse vessel, isolate the steam pipe
There is a way for everything
A lot of heat from the steam-water exchange, minimal space used
Double Wilo pumps on our node